Fire-Rated Doors

SOLUTIONS / FIRE-RATED DOORS

Fire-Rated Doors

Treat the door as a complete assembly.

THE APPROACH

Built around
your requirements.

Coordinate the door leaf, frame, hardware and installation details with the opening schedule and approved fire strategy. Verify documentation for the specified assembly.

Begin with the current environment, identify priorities and agree on a practical scope before selecting and implementing a solution.

Discuss this solution

IN DETAIL

What the scope can include

Review complete fire-door assemblies, schedules and installation interfaces. The agreed scope should identify equipment, interfaces, installation responsibilities and the records needed at handover.

Fire-Rated Doors - equipment and installation detail

SOLUTION AREAS

What your project can include

01

Door & opening schedules

02

Leaf, frame & hardware review

03

Product document checks

04

Installation & handover review

BUSINESS OUTCOMES

A clearer path
to better operations.

✓Avoid mismatched components

✓Compare quotations on the same scope

✓Retain assembly documentation

PLAN YOUR ENQUIRY

A clear brief. A practical scope.

Who this is for

Building owners, contractors and procurement teams comparing door packages.

What to send us

Door schedule, opening sizes, wall details, required ratings, hardware requirements and drawings.

Agree the deliverables

A coordinated assembly schedule, product documentation, installation scope and inspection records.

Supply, installation, testing, integration, training and support are separate scope items. Their inclusion, documentation, warranty and responsibilities must be stated in the project quotation.

Discuss Fire-Rated Doors

COMMON QUESTIONS

Before we start

What information helps prepare a Fire-Rated Doors enquiry?

Door schedule, opening sizes, wall details, required ratings, hardware requirements and drawings.

What documentation can be agreed at handover?

A coordinated assembly schedule, product documentation, installation scope and inspection records.

Does the quotation include installation and testing?

Only where listed in the agreed scope. Ask for separate supply, installation, testing and integration items, together with exclusions and acceptance responsibilities.

Can an existing system be upgraded?

Share the existing models, available drawings and the problem to resolve. Compatibility, site access and any interruption to operations need to be reviewed before an upgrade scope is confirmed.

How are brands, models and support selected?

Selection should follow the project requirements and compatibility review. Request exact model references, product documents, warranty conditions and a defined support scope before ordering.

YOUR NEXT CHAPTER

Let’s build what’s next.

Discuss your project