
SOLUTIONS / SPRINKLER SYSTEMS
Sprinkler Systems
Coordinate distribution with the building.
THE APPROACH
Built around
your requirements.
Prepare the sprinkler-system scope around the engineer-approved design, building arrangement and other services.
Begin with the current environment, identify priorities and agree on a practical scope before selecting and implementing a solution.
Discuss this solutionIN DETAIL
What the scope can include
Coordinate sprinkler equipment, layouts and installation responsibilities. The agreed scope should identify equipment, interfaces, installation responsibilities and the records needed at handover.

SOLUTION AREAS
What your project can include
Piping & support scope
Valves & accessories
Testing documentation
BUSINESS OUTCOMES
A clearer path
to better operations.
✓Coordinate routes before installation
✓Review material and fitting schedules
✓Document the installed system
PLAN YOUR ENQUIRY
A clear brief. A practical scope.
Who this is for
Owners and project teams delivering or upgrading water-based building protection.
What to send us
Approved sprinkler drawings, design basis, water supply details, ceiling layouts and site constraints.
Agree the deliverables
Agreed equipment schedules, installation boundaries, coordination records and test documentation.
Supply, installation, testing, integration, training and support are separate scope items. Their inclusion, documentation, warranty and responsibilities must be stated in the project quotation.
Discuss Sprinkler SystemsCOMMON QUESTIONS
Before we start
What information helps prepare a Sprinkler Systems enquiry?
Approved sprinkler drawings, design basis, water supply details, ceiling layouts and site constraints.
What documentation can be agreed at handover?
Agreed equipment schedules, installation boundaries, coordination records and test documentation.
Does the quotation include installation and testing?
Only where listed in the agreed scope. Ask for separate supply, installation, testing and integration items, together with exclusions and acceptance responsibilities.
Can an existing system be upgraded?
Share the existing models, available drawings and the problem to resolve. Compatibility, site access and any interruption to operations need to be reviewed before an upgrade scope is confirmed.
How are brands, models and support selected?
Selection should follow the project requirements and compatibility review. Request exact model references, product documents, warranty conditions and a defined support scope before ordering.
EXPLORE MORE


