What belongs in a fire-door cost comparison?

Two door prices may cover very different scopes. A clear comparison separates the product, hardware, installation and delivery requirements before judging the total.

Use the same schedule

Give each bidder the same opening information and designer-approved requirements. Record revisions so a changed quantity or configuration does not become an unexplained price difference.

Separate included work

List the leaf, frame, finish, hardware, transport and installation. Note opening preparation, making good and site-measurement responsibilities. Ask bidders to explain exclusions in writing.

Compare support as well as price

Check lead time, warranty boundaries, spare-part access and documentation. A lower initial figure may leave additional work with the buyer. Compare the whole agreed package before issuing the order.

A practical comparison record

Use a shared record for what belongs in a fire-door cost comparison. Give each party the same project information and document revision. Keep equipment selection, site interfaces and commercial responsibilities visible as separate items.

Review areaRecord to request
ProductComplete assembly and hardware schedule
Site workOpening preparation, fixing and finishing
CommercialQuantities, delivery and applicable charges
HandoverProduct records and installation acceptance

Example to discuss with your team

A per-leaf price and a complete installed-opening price describe different packages. Ask bidders to price the same schedule and mark exclusions explicitly.

Before requesting a quotation

  • Identify the project, site and current document revision.
  • Send the same scope and clarification questions to each bidder.
  • List exclusions, responsibilities and required handover records.
  • Keep agreed changes in writing so the purchase order reflects the final scope.

A clear comparison records unresolved questions as well as confirmed items. Assign each question to a responsible party and keep its written response with the quotation. Revisit the comparison when the document revision or scope changes.

Explore the relevant service

Fire-Rated Doors ↗Compliance Consultancy ↗

This is a project-planning overview. The responsible qualified professional must determine the site-specific design and applicable requirements.